IN ADDITION to the long running stoppage of the Aire & Calder, two more have been reported.
- Details
THE present hot weather is proving too much of a temptation for people to cool down in the waterways.
- Details
AFTER talking to CaRT employees and several local boaters, Stewart Downs writes.
- Details
IT HAS been a very long wait for the boaters trapped in the Ripon Canal Basin.
- Details
THERE is a delay with the broken swing bridge on the Selby Canal.
- Details
WORK on the breach on the Aire & Calder Navigation should be finished by mid August.
- Details
EXACTLY a month after it was closed, the 'Rochdale Nine' is reopened.
- Details
A TEMPORARY repair to the broken paddle has allowed Ribble Link navigation to reopen.
- Details