Leeds & Liverpool stoppage extended
Published: Friday, 08 March 2019
THE stoppage to repair Sandholme Aqueduct has been extended.
The waterway will not now be open until after the start of the boating season, the 8th of May, Keith Gudgin tells us.
New stop grooves
This is to enable new stop grooves to be constructed at Bridge 130B and the existing grooves to be inspected at Sandholme, with the two structures being dewatered at the same time.