A COMPLETE STOPPAGE will be in place during March and April to repair lock gates.
- Details
The narrowboat Pacemaker had been stuck teetering over the hole of the breach when it occurred on 22nd December.
- Details
THE BRIDGEWATER CANAL is still set to be fully repaired by December of this year.
- Details
THE POLLUTION INCIDENT that occurred on the Chesterfield Canal on 31st October has still not been cleared.
- Details
I can really understand Julian Taylor’s worry about bringing beavers onto the Erewash, writes T. Lang.
- Details
A LARGE HOUSING ESTATE is being built in Skipton that requires a canal bridge to be either replaced or rebuilt to handle the increased vehicular traffic.
- Details
ABANDONED BOATS ON THE Erewash Canal have been removed by the Canal & River Trust.
- Details
CANALS DESERVE SUPPORT for contributing to our economy—tourism, wildlife and well-being.
- Details
As someone who as spent considerable time in America I well know know of the problems caused by beavers, writes Julian Taylor.
- Details