narrowboatworld
  • Home
  • Information
  • Contact Us
  • Hire Guide

Filthy facilities on Lee & Stort

BOATER Carmen Smith was so disgusted at the state of the facilities on the Lee & Stort Navigation that she has complained to British Waterways about their state.

Details
Published: 26 November 2010

Showing the public

THIS winter British Waterways is giving the public the opportunity to see some of the maintenance to the waterways, with the latest at Hanwell Flight on the Grand Union Canal.
Details
Published: 25 November 2010

Stort towpath upgraded

WORK has begun this week on a £150,000 project to upgrade 220 yards of Stort towpath at Bishop's Stortford.

Details
Published: 24 November 2010

New bridge open this year

UPPER Mills Bridge on the Stroudwater Canal is nearing completion, and should be ready next month.

Details
Published: 24 November 2010

Emergency closure at Wigan

THE emergency closure at Wigan on the Leeds & Liverpool Canal was caused by the collapsed of the retaining structure.

Details
Published: 24 November 2010

Outsourced dredging contract

BRITISH Waterways have outsourced its dredging contract to the marine-based civil engineer Land & Water Services Ltd,  with a contract from next month to March 2015.

Details
Published: 24 November 2010

£33 to wind your boat!

SHOULD your boat be above 50 feet, and you want to wind at the bottom of the Oxford Canal it will not cost you £15 as first stated but £33!

Details
Published: 24 November 2010

Not a maintenance problem

IT IS fairly clear that the problem, which led to the pound between Bedford Staircase Locks and Planet Lock on the Caldon canal having to be drained, had nothing to do with BW maintenance procedures, writes Ralph Freeman.

Details
Published: 24 November 2010

Titford Pump comes home

THE Titford Pump that served the Titford Canal is to be reinstated by its original home on the wharf by Titford Pumphouse at Engine Street in Oldbury.

Details
Published: 22 November 2010

Linton gates go in

AFTER 25 years the gates of Linton Lock were deemed past their 'sell-by' date, and have been replaced.

Details
Published: 22 November 2010

Page 1325 of 1426

  • 1320
  • 1321
  • 1322
  • 1323
  • 1324
  • 1325
  • 1326
  • 1327
  • 1328
  • 1329

Latest

  • Victor doesn't think so
  • Not cost effective
  • Hampton Bank culvert timeline
  • Paddington Arm oil slick spreading
  • Unconnected boat parks the way forward?
  • Stuck for a year on the Llangollen
  • Shirley Drawbridge still closed
  • Still battling pennywort on the rivers and canals
  • Rotten broken lock beam closes Grand Union
  • Another Llangollen Canal problem
  • Below inflation licence fees for 2027/28
  • Another service failure but three repaired
  • Took the entire season to repair
  • Just public relations exercises
  • A CEO’s nightmare
  • Large oil spill stops Paddington Arm navigation
  • Leeds & Liverpool Canal swing bridge failure
  • Whole season to replace a lock gate
  • Two more Customer Service Facilities closed
  • The trust recognises the new breach will be causing significant concern for many boaters

Search