THE project to rebuild the Grade II Listed Hazlehurst Bridge on the Caldon Canal has been completed.
The 12 months Canal & River Trust project, costing £2 million, was implemented by an award from the Postcode Earth Trust, by funds raised by players of People’s Postcode Lottery.
This has allowed the bridge to be rebuilt in its former location and with the same form, scale and character as before, with many of the original stone copings reused.
Hazlehurst Bridge is an accommodation bridge that provides access across the Caldon Canal for farmers and residential boaters. It also provides access for the trust for maintenance work, but was damaged three and half years ago during repairs to Hazlehurst Bottom Lock.
Adnan Saif, Director for West Midlands at Canal & River Trust, explains:
“The Caldon Canal was originally built to transport limestone from the Peak District for the iron and pottery industries in Stoke-on-Trent.
“Constructed at the end of the 18th century, Hazlehurst Bridge is one of over 2,700 listed structures in the trust’s care. We are grateful to the support of players of People’s Postcode Lottery to enable us to rebuild this historic bridge within a particularly fascinating section of waterway, with multiple historic structures and a rich story to tell.
As a charity with increasing cost pressures, and with news that government is cutting support to keep canals open, it’s important we secure external investment to help us restore, protect and preserve our historic waterways to ensure that we don’t see the decline that took place in the early 20th century.”
The trust re-opened the Caldon Canal to boats at Easter and the towpath and local Public Right have also been reopened.